– PROJECT REVIEW J.E. TRAVIS PAINTING, INC.

Blanco ISD High School
Performing Arts Center

Blanco ISD painting project. A look back at a six-week commercial millwork build in Austin. What we made, what gave us trouble, and who carried it. 

CLIENT: 

Blanco ISD

Project Size:

$272k

Timeline:

Summer 2025

General Contractor:

Exterior Front Blanco ISD High School Addition in Blanco, Texas J. E. Travis Painting, Inc.

The Blanco ISD addition.

Scope: painting throughout, AcoustiBuilt acoustic ceilings, auditorium, gymnasium, classrooms.

The build at a glance

♦ What we did

The addition gives Blanco ISD a central gathering place. A full auditorium, a gymnasium, and supporting classrooms share one building, used by students and the community alike. J.E. Travis Painting handled the painting scope throughout, working alongside Joeris for nearly two and a half years.

The standout was the ceiling. The performance spaces called for AcoustiBuilt, a specialty acoustic ceiling system that improves sound quality in large rooms.

The performance spaces called for AcoustiBuilt, a specialty acoustic ceiling system that improves sound quality in large rooms.

♦ The Challenges

This was the team’s first AcoustiBuilt installation, and it went into the rooms where sound matters most. The finished result was well received by both Joeris and the district.
Plan a Project With Travis Millwork

Have a space that needs

this kind of work?

J.E. Travis Painting has delivered commercial painting, staining, tape and float, and wall coverings for projects across Texas since 1886

General Contractor: Joeris. Owner: Blanco ISD. Architect: LPA Design Studios. Blanco, Texas. Photography by BILT Marketing

San Antonio

(210) 525-8088

Austin

(512) 272-9663

Office

235 W Turbo Dr, San Antonio